Permits

Municipal compliance is non-negotiable. Proceeding without stamped approval guarantees severe financial penalties, mandated deconstruction, and nullification of property insurance policies.

DR

Document Repository

Compile a complete set of existing floor plans, proposed structural changes, electrical schematics, and mechanical routing. All documents must bear the seal of an architect or structural engineer licensed in your jurisdiction.

ZN

Zoning Bylaw Verification

Additions extending the footprint must adhere to specific lot setback requirements and permeable surface ratios. Calculate your Floor Space Index (FSI) to ensure the proposed square footage does not exceed legal neighborhood maximums.

IN

Inspection Milestones

Work cannot proceed unverified. Schedule municipal inspectors for the following phases before concealing any work behind drywall:

- Excavation and Footings
- Foundation Walls (pre-backfill)
- Rough Framing & Structural Steel
- Rough Plumbing, Electrical, and HVAC
- Insulation and Vapor Barrier